vergelijkingf brandproeven-2100x500
Exif_JPEG_PICTURE
Exif_JPEG_PICTURE
Exif_JPEG_PICTURE
Copy of GVB_Lieven Standaert_img_1116
Exif_JPEG_PICTURE

Windtunnel Design & Construction – part 5: the contraction duct

  The geometry of the contraction duct is to be defined by the following constraints: -a horizontal tangent at both ...

Exif_JPEG_PICTURE

Windtunnel Design & Construction – part 4: welding

Welding was done in the Antwerp workshop, with Kristof Arickx. A welding table was set up from  80x80mm square ...

Exif_JPEG_PICTURE

Windtunnel Design & Construction – part 3: getting the parts

  The steel parts were lasercut in serveral batches at Vandenbossche Metaalwerken, Mechelen and Provan, ...

test3ray_hdr2-edit

Windtunnel Design & Construction – part 2: design

  For reasons of durability the design brief preferred a steel-walled wind tunnel. The tunnel was conceived as a ...

windtunnel-IMG_0122.JPG-

Windtunnel Design & Construction – part 1: design brief

  In 2013 I designed & built the new low-speed windtunnel for the VUB, Vrije Universiteit Brussels. At the time I got ...